The Boba Fett Suit Fact Files

This thread is absolutely amazing! While the interchanging of the "six" suits is confusing this has made it that much more clear.

For that I commend you.
 
I will post the next facts here, because the first post is already too big and is hard too go through all the informations.

I'm focusing now mainly on the Supertrooper suit. Some of the information is not new, I think is good to point out some of the facts regarding the Supertrooper:

Naming-Boba-Fett-Costume-Documentation-Helmet.jpg Naming-Boba-Fett-Costume-Documentation-Dressing.jpg Naming-Boba-Fett-Costume-Documentation-Uniform.jpg Naming-Boba-Fett-Costume-Documentation-Weapons.jpg

Some images are from the Pre-Pro #1 suit (the bonnet and the pistol ones).

It seems that some of the facts about Boba Fett, as we know it now, are wrong or distorted by others. One of the things that was wrongly attributed to the Sister Helmets (Sandy Helmets = Pre-Pro #2, Sandy and ROTJ Hero) were the dental files in the back of the helmets, in the keyhole area attached to the MQ-1 board. As I recently noticed (check out this thread ==> Dental Files On The Supertrooper Helmet?), it seems that the Supertrooper helmet already had this feature and most likely it was present on the Pre-Pro #1 helmet too (the Supetrooper suit was converted to the Pre-Pro #1).

PP1 Dental Files.jpg

The next file is my speculation regarding the list of suits in the build order:

Naming-Boba-Fett-Costume-Documentation-Progress-Report-01.jpg Boba-Fett-Costume-Documentation-Progress-Report-02.jpg

The fact that the first suit says 'Complete and in U.S.A.' shows us that this is the Supertrooper/Pre-Pro #1 suit.
The suits No. 2, 3 and 4 (not necessary in that order) are the Sister (or Sandy) suits, because we know that she painted all three suits together and the Pre-Pro #2 photo shoot was in late October 1978, before the Holiday Special.
The suit No. 5 and 6 are the Pre-Pro #3 and the ESB suit, not sure which numbers, but I'm sure that the suit No. 6's helmet is the Pre-Pro #3 one (it says 'painted grey and sent to U.S.A.') while the sheet No. 2 says 'BACKPACK - SFX Dept. E.M.I.', this is why the Pre-Pro #3 suit has the Pre-Pro #1 Jetpack and gauntlets in those photo shoots.

--------------------------
New Addition 31-10-2011
--------------------------
There are another two images (which was presented in the first post of this thread) that are full of information about the Supertrooper/Boba Fett suits. These images were shooted before 3rd of October 1978 (the date of the first Boba Fett Progress Report) because the image shows at least 5 helmets, while the report had two helmets already in the U.S.A.

Boba-Fett-Supertrooper-Helmet-03-Callout.jpg Supertrooper Table Callout.jpg
--------------------------

And last but not least, here is a stenogram of the Supertrooper footage made in 1978, June the 28th at George Lucas's home. This will help to better understand the Supertrooper suit and the transformation to Boba Fett. While the file is not perfect and there might be some wrong words or gramatical mistakes (remember that I'm not an excellent english speaker and I did this file listening the footage and trying to write down all I tought it was correct) I think you will understand the essence of it.

View attachment Supertrooper.pdf

Enjoy!
 
Last edited by a moderator:
Wow! You are a premium fact finder indeed. Keep up the good work.

Thanks! I tried to compile all the info from TDH or other sites/sources, but some of the ideas are just my interpretation of events and facts that might be correct or totally wrong.
 
DaG vs ROTJ.jpg

Replaced this file in the first post because the ROTJ Hero left gauntlet can be seen on the AoSW/C-IV exibits and not in the MoM/Dag/SWtE exibits.

I saw that the ROTJ suit builders often omit some details from the original suit, so I did an image that shows these things:

ROTJ Missing Details.jpg

While the dent on the right chest is on the suit the whole time (except the scenes where they used the stunt suits), the extra lip on the flamethrower casing is present only in the promo shots, in Jabba's palace and the early skiff scenes, and missing in the late action scenes.
 
Replaced in the first post the Correct Timeline image with this one (and I hope it's more accurate):

Correct Timeline 2.jpg

I also replaced the 'Johnston Armor' expression with 'Twin Armor' and the 'Sandy Armor' expression with 'Sister Armor' to avoid further confusion.
 


Write your reply...
This thread is more than 10 years old.

Your message may be considered spam for the following reasons:

  1. This thread hasn't been active in some time. A new post in this thread might not contribute constructively to this discussion after so long.
If you wish to reply despite these issues, check the box below before replying.
Be aware that malicious compliance may result in more severe penalties.
Back
Top