CC knee armor and darts run for October-November

For who start to think I'm run aways with his money...:lol:

Update

-kit #1 100%done
-Kit #2 100%done
-kit #3 100%done
-kit #5 100%done
-kit #6 100%done
-Knee 90% done (I'm casting the last 2 frontal pieces)
 
almost done guys, almost done!;)
2300108220101434745S600x600Q85.jpg
 
Last edited by a moderator:
The knee are ready!
2995266190101434745S600x600Q85.jpg


Tomorrow or the day next I'll ship them.
BTW, today I started with some shipping.Check the 1st post:thumbsup:
 
Last edited by a moderator:
Back
Top