The scope mounts and the v8 arm and flywheel are clayed and boxed, just need to degass and pour the silicone over them.
The mounts will take 3 days, as its a squish mold, the rest a day.
I have 3 of 8 needed good masters of the plug ends. Im fabricating the center square piece and that concludes the greebles.
The scope rings, im trying to figure out the best way to do the mold. Ive failed multiple times to get one with really clean lines.
Once I determine exactly whats going to be included in the kit, for the premium kits <= 240, for the seconds, <= 200 but the seconds are NOT guaranteed. Ill never know how many there are of those. Im not getting many failures.