Reply to thread

The building u in have a boiler ? Think they heat water to around 240 deg. 1/4 copper tubing wraped in a coil around the tube all the way down would do good I would think. Should have a bleed down valve on the supply and return lines to the boiler.  Tie one end of the Copper to one the other in to the other and cut on the valves. If it getting to hot close off the valve on the supply some.

Or if your boiler is long enough lay the pipe your using on top . should get hot enough. :)


This thread is more than 13 years old.

Your message may be considered spam for the following reasons:

  1. This thread hasn't been active in some time. A new post in this thread might not contribute constructively to this discussion after so long.
If you wish to reply despite these issues, check the box below before replying.
Be aware that malicious compliance may result in more severe penalties.
Back
Top