Reply to thread

Continuing on, I super glued some screws underneath the top section and then fully secured them with a large amount of JB weld.  I spread the JB weld over a large surface area to keep the screws from pulling out once they have are secured to the upper curve. I have also shaded out regions on the upper curve where I cut-outs are planned so that I can have better access for the switches, etc. later on in the build.

[ATTACH]49952[/ATTACH][ATTACH]49953[/ATTACH][ATTACH]49954[/ATTACH]


This thread is more than 9 years old.

Your message may be considered spam for the following reasons:

  1. This thread hasn't been active in some time. A new post in this thread might not contribute constructively to this discussion after so long.
If you wish to reply despite these issues, check the box below before replying.
Be aware that malicious compliance may result in more severe penalties.
Back
Top