CC knee armor and darts run for October-November

For who start to think I'm run aways with his money...:lol:

Update

-kit #1 100%done
-Kit #2 100%done
-kit #3 100%done
-kit #5 100%done
-kit #6 100%done
-Knee 90% done (I'm casting the last 2 frontal pieces)
 
almost done guys, almost done!;)
2300108220101434745S600x600Q85.jpg
 
Last edited by a moderator:
The knee are ready!
2995266190101434745S600x600Q85.jpg


Tomorrow or the day next I'll ship them.
BTW, today I started with some shipping.Check the 1st post(y)
 
Last edited by a moderator:
This thread is more than 12 years old.

Your message may be considered spam for the following reasons:

  1. This thread hasn't been active in some time. A new post in this thread might not contribute constructively to this discussion after so long.
If you wish to reply despite these issues, check the box below before replying.
Be aware that malicious compliance may result in more severe penalties.
Back