Beacon and Stabilizer sign up list

Here is an update........

All of the main work is done to the beacons, they just need the slots put in them. The plan is to get the slots milled in them tomorrow then ship them out to there new homes ASAP.

The stabilizers are done.

DSC00555.JPG


DSC00556.JPG
 
These pieces turned out AWESOME (y)

I have a few beacons left to mill the slots into tomorrow. I'll get them all boxed up tomorrow night and get them out Tuesday. Thats the plan (y) .

-Tim-
 
This thread is more than 17 years old.

Your message may be considered spam for the following reasons:

  1. This thread hasn't been active in some time. A new post in this thread might not contribute constructively to this discussion after so long.
If you wish to reply despite these issues, check the box below before replying.
Be aware that malicious compliance may result in more severe penalties.
Back
Top